How do I perform a functional test on my AV-400 RRFB?

Use these steps to verify the AV-400 system is operating correctly on site.


Test steps

  1. Activation test — Press the push button on one unit. All units at the crosswalk should begin flashing immediately.
  2. Multi-unit sync test — Walk to the opposite push button and press it. All units should activate again from a single button press at either end.
  3. RRFB position RRFB is securely tightened and facing oncoming traffic.
  4. Solar panel and engine secure solar panel is pointing south, and the solar engine is tightly secured without any movement.
  5. Clear sky access System has a clear, unobstructed view of the sky.
  6. Future shading check Look for nearby trees or other objects that might block sunlight over time. If shading is possible, set a reminder to inspect it later.
  7. Battery voltage Batteries should be at least 12.0 V for proper operation. Once voltage drops below 10 V the RRFB(s) stops flashing.
  8. Solar charging Batteries under charge should be 13+ V, confirming charging is operational.